BEIRUT MUNICIPAL STADIUM

An outstanding record in fast track construction which was further reinforced by its completion of the 22,000 seat Beirut Municipal Stadium, the majority of which was completed in 70 days for the Pan Arab Games. In order to meet the tight deadlines, a large number of materials had to be air freighted. The project includes the installation of 4,000 precast panels and was designed to International Standards (FIFA).

The works included all associated MEP works including fire fighting, HVAC, irrigation, drainage, high and low current, BMS, control system, lighting, generators and one substation.