UPGRADE OF AL WAKRAH MAIN ROAD
The general objectives of the project include expansion of network capacity, improve traffic flow, increase safety, reduce congestion, minimise travel times and minimise potential environmental impacts
The project comprises three smaller projects.
- Al Wakrah Main Road Interim Scheme comprising cost-effective but essential improvements to the Al Wakrah Road over a distance of 4.5 kms.
- Entrusted Works Order (EWO27) linking Project P011 – At grade Works including minor utility diversions and 1.8 kms of pavement construction with extensive Metro Interface.
- Junction 17/01 – Phase 2 Works (P017 C1) works include the construction and paving of a four-arm at-grade signalized interchange, 1.9 kms of At grade paving, tunnel control building and substation, MEP fit-out to a grade separated tunnel structure constructed by others, drainage infrastructure including attenuation tank, gravity and pumped network and emergency flood area, highway services including lighting and ITS, landscaping and diversion and protection to utility authority plant